Chief Minister's Solar Powered Green House Scheme (CMSPGHS)

(Button) Back to RD Schemes Back to Schemes

Related pages

(G.O.Ms.No.46 RD&PR(SGS-1) Dept Dated : 17.08.2011

  • The Scheme was launched for the benefit for the people who are in BPL in rural areas.

  • Each house is built with an area of 300 Sq.ft. at an unit cost of  2.1 Lakhs per house @ 1.8 lakhs for construction and Rs. 30,000 for Installation of Solar Powered Lights.

  • Special house for weavers in 365 sq.ft  at an unit cost of Rs.2.60 lakhs  per house @ Rs.2.30lakhs for construction andRs.30,000 for installation of Solar powered lights.

  • The Scheme is fully funded by State Government.

  • Rain Water Harvesting is provided in all houses.

Eligibility:

  • People who are in BPL with own household patta for their sites are eligible and the beneficiaries are selected through Grama Sabha.

  • No land acquisition envisaged under this scheme.

     Allocation :  29% SC, 1% ST, 70% Others.

Salient Features of the Scheme

  1. Each house is built with 300 Sq. ft. with the living room, bed room, kitchen, sit out and toilet.

  2. Each house is provided with 5 CFL Lamps one each in bed room, living room, kitchen, toilet and sit out.

  3. Where ever possible toilet is constructed by Dovetailing fund from TSC.

  4. To ensure uniformity no change in type design is permitted.

  5. The logo for the scheme engraved on ceramic tiles shall be affixed visibly in the front.

In the year 2013-14 – 2182 houses have been constructed at an estimate cost of 4582.20 lakhs in which 654.60 lakhs exclusively released to TEDA for provision of Solar lights @ Rs. 30,000 per house for Solar Lights.  In the year 2014-15 also same nos. of houses have been taken up with same allocation

CMSPGHS 2014-15 (Physical Stage Details)

Sl.No

Block Name

No. of Works

Stages of Pending works

 

Taken up

Completed

Pending

% of Completion

Basement completed

Lintel Level

Roof Level

Roof Laid

Plastering

Physically Completed

Pending

 
 

1

2

3

4

5

6

10

11

12

13

14

15

16

 
Sub Division Name :: Tiruvallur  

1

TIRUVALLUR

172

80

92

46.51

0

0

0

56

26

10

92

 

2

POONDI

161

96

65

59.63

0

0

0

36

27

2

65

 

3

KADAMBATHUR

171

83

88

48.54

0

0

0

50

38

0

88

 

Total

504

259

245

51.39

0

0

0

142

91

12

245

 
Sub Division Name :: Tiruttani  

4

TIRUVALANGADU

207

90

117

43.48

0

0

0

30

87

0

117

 

5

TIRUTTANI

154

94

60

61.04

0

0

0

50

10

0

60

 

6

PALLIPET

151

88

63

58.28

0

0

0

44

19

0

63

 

7

R.K.PET

157

98

59

62.42

0

0

0

32

20

7

59

 

Total

669

370

299

55.31

0

0

0

156

136

7

299

 
Sub Division Name :: Saidapet@Ambattur  

8

VILLIVAKKAM

86

65

21

75.58

0

0

0

11

10

0

21

 

9

PUZHAL

40

36

4

90.00

0

0

0

3

1

0

4

 

10

SHOLAVARAM

192

125

67

65.10

0

0

0

55

12

0

67

 

11

POONAMALLEE

101

66

35

65.35

0

0

0

13

22

0

35

 

Total

419

292

127

69.69

0

0

0

82

45

0

127

 
Sub Division Name :: Ponneri  

12

MINJUR

218

128

90

58.72

0

0

0

42

48

0

90

 

13

GUMMIDIPOONDI

216

116

100

53.70

0

0

0

62

38

0

100

 

14

ELLAPURAM

156

116

40

74.36

0

0

0

35

5

0

40

 

Total

590

360

230

61.02

0

0

0

139

91

0

230

 

Grand Total

2182

1281

901

58.71

0

0

0

519

363

19

901

 

CMSPGHS 2014-15 (Physical and Financial Progress)

Sl.

No.

 

Block Name

Physical Progress

Financial Progress

(No. of Works)

[Amount Rs. in lakhs]

Taken Up

Completed

Balance

% of Comp.

AS Amount

Expenditure

Balance

% of Expen.

Sub Division Name :: Tiruvallur

1

TIRUVALLUR

172

80

92

47

309.60

174.60

135.00

56.40

2

POONDI

161

96

65

60

289.80

228.82

60.98

78.96

3

KADAMBATHUR

171

83

88

49

307.80

221.42

86.38

71.94

Total

504

259

245

51

907.20

624.83

282.37

68.87

Sub Division Name :: Tiruttani

4

TIRUVALANGADU

207

90

117

43

372.60

227.49

145.11

61.05

5

TIRUTTANI

154

94

60

61

277.20

214.23

62.97

77.28

6

PALLIPAT

151

88

63

0

271.80

211.82

59.98

77.93

7

R.K.PET

157

98

59

62

282.60

219.38

63.22

77.63

Total

669

370

299

55

1204.20

872.92

331.28

72.49

Sub Division Name :: Saidapet@Ambattur

8

VILLIVAKKAM

86

65

21

76

154.80

115.94

38.86

74.90

9

PUZHAL

40

36

4

90

72.00

65.40

6.60

90.83

10

SHOLAVARAM

192

125

67

65

345.60

225.00

120.60

65.10

11

POONAMALLEE

101

66

35

65

181.80

119.10

62.70

65.51

Total

419

292

127

70

754.20

525.44

228.76

69.67

Sub Division Name :: Ponneri

12

MINJUR

218

128

90

59

392.40

230.40

162.00

58.72

13

GUMMIDIPOONDI

216

116

100

54

388.80

208.80

180.00

53.70

14

ELLAPURAM

156

116

40

74

280.80

220.20

60.60

78.42

Total

590

360

230

61

1062.00

659.40

402.60

62.09

Grand Total

2182

1281

901

59

3927.60

2682.59

1245.01

68.30