  •      Tamil Nadu Government has introduced the flagship scheme called Tamil Nadu Village Habitation Improvement (THAI) Scheme,to provide minimum basic infrastructure facilities in all village panchayat habitations.

  •      In 2011-12 the scheme was implemented with an annual allocation of Rs. 680 Crores.

  •      Programmed  to be implemented in V Phase from 2011-12 to 2015-16.

  •      All the Habitations  in Village panchayats will be provided with all basic infrastructure facilities within a span of 5 years.

Scheme Compoenents

Sl. No.

Minimum Basic Requirements

Additional Requirements

Other Works

1

Water Supply

Anganwadi Centeres

Any Other Permitted Work

2

Street Lights

Public Distribution Shops

3

Roads

SHG Buildings

4

Burial Grounds

Threshing Floor

5

Pathway to Burial Grounds

Play Ground

  1. Water Supply – Provision of powerpump, extension of pipe line, Augmentation of existing sources.

  2. Street Lights – New Street Lights to new habitations, extension areas, Aathidravidar and Tribal habitation and IAY housing colonies.

  3. CC Road – New CC Roads will be laid Pavements with residential units on sides, streets are lanes prone to water logging.

  4. Link Road - will cover bus plying roads, upgradation of WBM Road to BT Road connecting 2 or more habitations in same panchayat

  5. Upgradation of earthen and gravel roads.

  6. Cremation and Burial Ground
    - Each Burial Ground will be provided with Approached road
    - Compound wall
    - Cremation Shed
    - Water Facility and Lights

  7. Pathway to Burial Ground
    -
    Improvements to existing pathway and top priority to provide approach road or pathway where pathway is not available.

  8. Additional Requirements and Other Permitted works will be taken based on need and priority.

  9. Dovetailing funds from various schemes of RD & PR Department to make the habitation full-fledged.

    - In the year 2013-14 => 1533 works have been taken up at an estimate cost of 3049.10 lakhs. 

    - In the year 2014-15 => 1392 works have been taken up at an estimate cost of Rs.3241.00 lakhs. 

    - In the year 2015-16 => 1193 works Proposed to  Taken up under Estimate Cost of Rs. 2760.00 Lakhs.

 

THAI BLOCK WISE PHYSICAL AND FINANCIAL PROGRESS FOR 2014-2015

Sl. No

Block Name

Physical Progress

Financial Progress

(No. of Works)

[Amount Rs. in lakhs]

Taken Up

Completed

Balance

% of Comp.

AS Amount

Expenditure

Balance

% of Expen.

Sub Division Name :: Tiruvallur

1

TIRUVALLUR

124

119

5

95.97

210.000

175.386

34.614

83.52

2

POONDI

165

147

18

89.09

353.000

218.980

134.020

62.03

3

KADAMBATHUR

152

145

7

95.39

230.000

199.476

30.524

86.73

Total

441

411

30

93.20

793.000

593.842

199.158

74.89

Sub Division Name :: Tiruttani

4

TIRUVALANGADU

81

76

5

93.83

204.800

180.250

24.550

88.01

5

TIRUTTANI

57

48

9

84.21

158.000

99.620

58.380

63.05

6

PALLIPET

100

95

5

95.00

185.000

133.016

51.984

71.90

7

R.K.PET

111

105

6

94.59

220.000

181.725

38.275

82.60

Total

349

324

25

92.84

767.800

594.611

173.189

77.44

Sub Division Name :: Saidapet@Ambattur

8

VILLIVAKKAM

43

41

2

95.35

137.000

99.440

37.560

72.58

9

PUZHAL

15

14

1

93.33

50.000

29.985

20.016

59.97

10

SHOLAVARAM

88

73

15

82.95

230.000

149.810

80.190

65.13

11

POONAMALLEE

49

44

5

89.80

120.000

100.448

19.552

83.71

Total

195

172

23

88.21

537.000

379.682

157.318

70.70

Sub Division Name :: Ponneri

12

MINJUR

155

143

12

92.26

417.000

361.417

55.583

86.67

13

GUMMIDIPOONDI

175

153

22

87.43

480.000

336.026

143.974

70.01

14

ELLAPURAM

78

69

9

88.46

251.200

185.973

65.228

74.03

Total

408

365

43

89.46

1148.200

883.416

264.785

76.94

Grand Total

1393

1272

121

91.31

3246.000

2451.551

794.449

75.53

 

THAI 2014-15

 

 

 

 

 

 

 

As on 21.01.2015

Sl. No.

Work type

Physical Progress

Financial Progress

Taken up

Comp-leted

Pending

% of Comp-letion

AS Amount

Expenditure

Balance

% of Expenditure

I.

Minimum Basic Requirement

1

Street Light

501

501

0

100.00

209.395

207.457

1.938

99.07

2

Water Supply

191

191

0

100.00

294.993

294.890

0.103

99.97

3

Roads

392

334

58

85.20

1439.263

988.348

450.915

68.67

4

Improvement to Burial Ground

151

116

35

76.82

522.082

375.505

146.577

71.92

5

Pathway to Burial Ground

136

109

27

80.15

713.515

523.599

189.917

73.38

Sub Total

1371

1251

120

91.25

3179.248

2389.799

789.449

75.17

II.

Additional Requirement

 

1

Anganwadi

2

2

0

100.00

9.000

9.000

0.000

100.00

2

PD Shop

1

1

0

100.00

5.500

5.500

0.000

100.00

4

Threshing floor

5

4

1

80.00

16.407

11.407

5.000

69.53

Sub Total

8

7

1

87.50

30.907

25.907

5.000

83.82

III.

Other Requirement

 

1

Drainage

10

10

0

100.00

26.625

26.625

0.000

100.00

2

Culvert

1

1

0

100.00

1.000

1.000

0.000

100.00

3

Bus Shelter

1

1

0

100.00

1.750

1.750

0.000

100.00

4

Small Bridge

2

2

0

100.00

6.470

6.470

0.000

100.00

Sub Total

14

14

0

100.00

35.845

35.845

0.000

100.00

Grand Total

1393

1272

121

91.31

3246.000

2451.551

794.449

75.53